ARA has resumed the appraisal of the very promising Farha SW field in Oman with the addition of a second rig. The program includes the drilling of six wells targeting both subsurface reservoirs, one of these wells will be horizontal. In parallel the initial Farha FDP is being prepared. A third rig will enter ARA’s Oman operations at the end of Q1 2025.